
Project Description
ELEMEC GBC members have provided complete MEP designs and supervision (Stages 1 to 7). The designs adopt a passive approach to reduce solar gain, heat loss and energy consumption as well as to provide comfortable living and working conditions. The building design goes beyond the local requirements of the Energy Performance Certificate (EPC) regulations. All apartments are designed to comply with the Nearly Zero Energy Building (NZEB) performance criteria whereby at least 25% of the primary energy consumption is solar energy. The building obtained an ‘A’ rating EPC with low CO2 emissions. Delivery period: started in 2017, to be completed in 2020.
- Client :
FINIKIS TERRACES - Category :
Residential - Started :
2017 - Delivered :
Ongoing