ELEMEC GBC - Projects, Imperio Tower
Project Description

ELEMEC GBC members have provided integrated MEP designs, supervision (Stages 1 to 6) and ‘A+’ rated EPCs for this prestigious office building. The design of the Imperio Tower is based on the provisions of 2020 Nearly Zero Energy Building (NZEB) performance criteria whereby 25% of the energy consumption is generated from solar energy. The design of the building façade adopts a passive approach to reduce solar gain using a bespoke shading tracking PV system. The building is highly insulated to minimize heat loss and energy consumption as well as to provide comfortable working conditions. The HVAC is designed with high-efficiency systems to maximize the energy efficiency of the building.

  • Client :
    Imperio Tower
  • Category :
    Offices
  • Started :
    2017
  • Delivered :
    2021